Huawei NE05E Series Quick Installation Manual page 7

Mid-end, cabinet
Hide thumbs Also See for NE05E Series:
Table of Contents

Advertisement

NE05E-SG/NE05E-SH/NE05E-SI/NE05E-SQ
Power supply interface
Clock interface
Electrical interface
Power supply interface
10GE optical interface
Time interface
NOTE
For running an AC NE05E-SQ, you must turn on the switches of both AC power modules operating
in 1+1 backup mode.
PGND point
FE/GE optical interface
10
E1 interface
Antistatic jack interface
FE/GE optical interface
4
GE optical interface
Alarm interface
NM interface
(Console interface)
FE/GE electrical interface
10
NM interface
(Console interface)
Time interface
Clock interface
Alarm interface

Advertisement

Table of Contents
loading

Table of Contents