Signal
GNSS test pattern - simulcast
®
ASTRO
25 system voice
ASTRO
®
25 system wide pulse
5.11.2
Monitoring the Power Supply Module
Perform the following procedure to monitor the power supply.
Procedure:
1 Connect to the base radio in Configuration/Service Software (CSS) through an Ethernet
connection. See
Connecting Through an Ethernet Port Link on page
2 From the menu, select Service → Metering Screens.
The Metering Screen window opens on the Power Supply tab.
Figure 79: Metering Screen Window
5.11.3
Verifying Receiver Performance for FDMA Operation
When and where to use:
Use this procedure to verify receiver performance by measuring the Bit Error Rate (BER) and Received
Signal Strength Indication (RSSI) for digital operation.
Procedure:
1 Make the following connections to the base radio:
a Disconnect the BNC antenna cable (or N connector if preselector is present) from the receive
antenna Port.
b Connect the service monitor GEN port to the base radio Antenna Port.
2 Set up the service monitor:
a Set modulation to Project 25 (C4FM) with a Standard 1011 test pattern.
b Set the service analyzer to generate at the receive frequency.
c Set the RF level an initial value of -47 dBm.
Chapter 5: GTR 8000 Base Radio Optimization
Minimum Devia-
Nominal Devia-
tion
undetermined
3.24 kHz
undetermined
MN003286A01-E
Maximum Devia-
tion
3.00 kHz
undetermined
3.60 kHz
3.96 kHz
3.00 kHz
undetermined
140.
tion
185