Figure 4-27 Fan commissioning
The fan commissioning item is mandatory. After commissioning for a component succeeds, the system
automatically performs commissioning for the next component you selected. If commissioning fails,
startup wizard ends.
Step 6 View the commissioning result.
Issue 07 (2020-03-16)
Figure 4-28
is displayed if component commissioning succeeds.
Figure 4-28 Commissioning successfully
Figure 4-29
is displayed if component commissioning fails, which ends startup wizard
commissioning.