Huawei IPE Series Installation Manual page 23

Table of Contents

Advertisement

IPE
Installation Guide
Figure 4-2 Drilling holes
Step 3 Drive the four white expansion particles that are delivered with the IPC into the positioning
holes, as shown in Figure 4-3.
Figure 4-3 Driving the expansion particles into the positioning holes
Step 4 Take out the mounting base and stainless self-tapping screws that are delivered with the IPC.
Use the stainless self-tapping screws to secure the mounting base onto the ceiling or wall, as
shown in Figure 4-4.
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
4 Installing an Infrared Waterproof Tube-Type IPC II
16

Advertisement

Table of Contents
loading

Table of Contents