Pre-Fab. Module Entry Requirements - Huawei FusionModule 1000A20 Maintenance Manual

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule 1000A20:
Table of Contents

Advertisement

FusionModule1000A20 Prefabricated All-in-One Data
Center
Maintenance Guide
The documents provided in the solution only include the special maintenance items,
maintenance methods, and precautions of the components. For other maintenance items of the
components, see the documents delivered with the components.
Table 2-2 Maintenance documents to be prepared
Component
FusionModule1000A
AC/DC power system
ECC800
NetEco

2.3 Pre-fab. Module Entry Requirements

The following describes the requirements for working in the FusionModule1000.
Item
Before entry
Entry
preparations
Issue 01 (2019-07-15)
The ECC800/NetEco version depends on the version in use. Click
WebUI to obtain the current version.
For NetEco maintenance, see the NetEco documents.
Requirement
Obtain the entry permit.
The detailed operations are performed based on the requirements
specified by the manager of the FusionModule1000.
Obtain ESD clothes and shoes.
Remove dust from tools and materials that need to be taken into the
Copyright © Huawei Technologies Co., Ltd.
2 Operation and Maintenance Preparations
Document
FusionModule1000A20 Prefabricated
All-in-One Data Center V200R003C10
Initial Configuration Parameter Manual
TP48200B-N20B2, TP48200B-N20B3,
TP48200B-L20B2, TP48400B-N20B3,
TP48400B-L20B1 Indoor Power System
Installation Guide
TP48600B-N20B1 Indoor Power Supply
Installation Guide
TP482000B V300R002C03 Central Office
Power System User Manual
(TP482000B-N20B1,TP482000B-N20B2,TP
481200B-N20B1 and TP481200B-N20B2)
ECC800 Data Center Controller
V100R003C00 User Manual
iManager NetEco Product
Documentation-(V600R008C10)
on the ECC800/NetEco
5