Checking The Settings Of Transformers T21, T101 And T111; T21 And T101 Tap Settings (400 - ABB ACS880-207 Hardware Manual

Industrial drives, igbt supply units
Hide thumbs Also See for ACS880-207:
Table of Contents

Advertisement

Electrical installation 55

Checking the settings of transformers T21, T101 and T111

Auxiliary voltage transformer [T21, T101, T111] connections are made at the factory according
to the supply voltage and desired output voltage and you do not need to change the settings
during the installation. If needed (for example, due to a later part replacement), check the
connections using the diagrams below.
Transformer [T21] is a standard equipment. Transformers [T101] and [T111] are present if
required by the options specified by the customer.
The voltage settings of transformers [T21] and [T101] are made at terminal blocks
[T21_X1/X2] and [T101_X1/X2] respectively. The settings of transformer [T111] are made
on the transformer itself. The locations of the transformers and the terminal blocks are shown
in the layout drawing of an auxiliary control cubicle and in the circuit diagrams delivered
with the drive.
T21 and T101 tap settings (400...500 V units)
T21_X1 or T101_X1
T21_X2 or T101_X2
11
without +G304
with +G304