Mounting - ABB ControlMaster CM15 Commissioning Instructions

Universal process indicator, 1/8 din
Hide thumbs Also See for ControlMaster CM15:
Table of Contents

Advertisement

10
C O N T R O L M A S T E R C M 1 5 | U N I V E R S A L P R O C E S S I N D I C ATO R , 1/8 D I N | C I/C M 1 5 - E N R E V. A
...3 Installation

Mounting

ControlMaster CM15 is designed for panel mounting.
For NEMA4X protection, a panel thickness of 2.5 mm
(0.1 in) is required.
Referring to Figure 3:
1
Cut a hole of the correct size for the indicator in the
panel.
2
Insert the indicator into the panel cut-out.
50
(2.0)
20 (0.8)
92
+0.8
(3.6
+0.03
–0
45
+0.6
–0
(1.8
+0.02
)
–0
Panel cut-out dimensions
Figure 3 Mounting dimensions
97 (3.8)
120 (4.8)
44.8
(1 .7 )
140 (5.5)
–0
)
≥30 (1.18)
14 (0.55)

Advertisement

Table of Contents
loading

Table of Contents