Connecting The Battery - Toro 41250 Installation Instructions Manual

Road light and homologation kit for multi pro 1750 turf sprayer
Table of Contents

Advertisement

Figure 52
1. 3-position switch
7. Align the control-panel cover to the side console
(Figure
53).
Figure 53
1. Control-panel cover
8. Secure the control-panel cover to the side console
with the 4 hex-head screws (1/4 x 1/2 inch) removed
in step 2.
9. Install the knob onto the differential-lock rod
45).
2. 8-socket connector (with
the line in slot number 1)
2. Side console
(Figure
13

Connecting the Battery

No Parts Required
Procedure
1. Align the ring terminal for the machine wire harness,
ring terminal of the kit wire harness, terminal for
the positive battery cable to the positive battery post
(Figure
54).
1. Nut
2. Positive battery post
3. Terminal (positive battery
cable)
4. Insulator cover
2. Secure the ring terminals and battery terminal to the
battery post
(Figure
in step
4
of
1 Preparing the Machine (page
3. Align the insulator cover over the positive battery
terminal
(Figure
21
Figure 54
5. Ring terminal (machine
wire harness)
6. Ring terminal (kit wire
harness)
7. Bolt
54) with the bolt and nut removed
54).
4).

Advertisement

Table of Contents
loading

Table of Contents