Toro 41250 Installation Instructions Manual page 8

Road light and homologation kit for multi pro 1750 turf sprayer
Table of Contents

Advertisement

3. Remove the backing from a speed decal.
4. Align the top and forward edges of the sprayer decal
(B of
Figure
12) with the tape marks that you made
in steps
2
and 1.
5. Press the decal onto the surface of the tank from the
top down while removing air bubbles as you apply the
decal.
6. Remove the masking tape from the tank.
7. Repeat steps
3
though
Installing the Speed Sign the
Center-Boom Section
1. Remove the backing from a speed decal (A of
13).
2. Align the decal to the speed sign as shown in B of
Figure
13.
3. Press the decal onto the surface of the tank from the
top down while removing air bubbles as you apply the
decal.
4. Remove the 2 flange locknuts (5/16 inch) that secure
the bracket for the lift-cylinder manifold to the
lift-cylinder mount
Note: Do not remove the 2 flange-head bolts (5/16
x 1 inch)
6
at the other side of the tank.
Figure 13
(Figure
14).
Figure
1. Flange locknuts (5/16
inch)
2. Lift-cylinder mount
3. Flange-head bolt (5/16 x
1 inch)
5. Assemble the speed sign to the 2 flange-head bolts
(5/16 x 1 inch) with the 2 flange locknuts (5/16 inch)
that you removed in step 4.
6. Torque the nuts and bolts to 198 to 254 N∙m (175 to
225 in-lb).
8
Figure 14
4. Bracket (lift-cylinder
manifold)
5. Speed sign

Advertisement

Table of Contents
loading

Table of Contents