Node Verification; Sfp Repair; Verifying The Node Status; Replaced Node Status Led - HP 3PAR StoreServ 7450 Service Manual

Hide thumbs Also See for 3PAR StoreServ 7450:
Table of Contents

Advertisement

Node Verification

1.
Verify the node is installed successfully:
a.
Under the Systems tree in the left panel, double click the storage system just serviced.
b.
In the lower, right of the Summary tab, in the Health section, check the State status is
Normal.
NOTE:
Figure 42 Verifying the Node Status
2.
Select Controller Nodes. The Status LED for the replaced node may indicate green and take
up to 3 minutes to change to green blinking (see
Figure 43 Replaced Node Status LED

SFP Repair

The SFP is located in the port on the controller node HBA/CNA and there are two to six SFPs per
node.
Before you begin, use either SPMAINT or the HP 3PAR Management Console to identify the failed
SFP.
SFP Identification
1.
Under the Systems tree in the left panel, select the storage system to be serviced.
2.
On the Summary tab, click the Port link to open the port's tab.
If the state is not normal contact your ASP for further assistance.
Figure 43 (page
41)).
SFP Repair
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

3par storeserv 7450c

Table of Contents