LG Multi V ARUB Series Installation Manual page 60

Heat recovery outdoor unit
Hide thumbs Also See for Multi V ARUB Series:
Table of Contents

Advertisement

HR Unit PCB
3) Flow chart for Manual pipe detection
Execute in case of Auto pipe detection
failure
Turn No.1 of SW02M of HR unit PCB on.
Reset the power of HR unit PCB.
Enter the central control address into
each indoor unit using its wired remote
control.
On the HR unit PCB, manually set address
of each valve of the HR unit to the central
control address of the indoor unit
connected to the valve.
Turn No.6 of SW03M of outdoor unit PCB
on.
Reset the power of outdoor unit PCB.
60
Outdoor Unit
Wait for about 5 minutes.
The number of the indoor units installed is
displayed.
Ex)HR ➠ The number of the indoor
Are the number
of indoor units connected to the
outdoor unit and displayed one
equal?
YES
Turn No.6 of SW03M of outdoor unit PCB
off.
Completion of manual pipe detection
NO
Check the central control address of
indoor and HR unit.
Make sure that reset the outdoor unit
power when changing the central
control unit

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents