I/P Converter - ABB AV1 Operating Instructions Manual

Actuators & positioners
Hide thumbs Also See for AV1:
Table of Contents

Advertisement

REPAIR AND REPLACEMENT
Tools Required:

I/P Converter

Tools Required:
REPLACEMENT PROCEDURES
8 - 4
Flat-tip screwdriver.
1. Transfer the positioner from automatic to manual operation
(Section
5).
2. Remove the positioner cover by removing the two cover screws.
3. Carefully unhook the ends of the valve clip (Item 5). Remove the
valve clip from the valve body. Remove the valve stem (Item 3) from
the lower end of the valve body.
4. Remove the two pilot valve screws (Item 52) securing the valve
body and lift the valve body off the housing.
5. Replace the O-rings. Clean the O-ring grooves and apply Dow
Corning No. 4 or equivalent lubricant to the O-rings.
6. Set the (replacement or clean) valve body in place.
7. Secure the valve body by replacing and tightening the pilot valve
screws to 2.6, ±0.2 Nm (23, ±2 in.-lbs).
8. Make certain the valve stem is clean. Install the valve stem.
9. Install the valve clip.
10. Transfer the positioner back to automatic operation
11. Perform the procedure outlined in
ADJUSTMENT.
NOTES:
1.
Refer to
Section 9
2.
Item numbers in this procedure reference Figure 9-4.
3.
This procedure only applies to Type AV2 positioners.
Flat-tip screwdriver.
T15 Torx.
Pliers.
1. Transfer the positioner from automatic to manual operation
(Section
5).
2. Remove the positioner cover by removing the two cover screws.
3. Remove the two wires that connect the I/P converter (Item 80) to
the termination assembly (Item 59).
4. Loosen the three screws (Item 58) securing the I/P bracket.
PILOT VALVE STROKE
for I/P converter part numbers.
(Section
5).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Av2Sv1121000

Table of Contents