Download Print this page

Huawei FusionDC1000A Quick Manual page 16

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:

Advertisement

No.P018 Lithium battery installation position diagram
1.
Find the UPS battery module ( 02311PCW*8pcs )
from the packaged materials.
2.
Removing the filler panel from the UPS.
Installation positions of lithium batteries
3.
Remove the protective cover from the rear of the
battery
3.
Push the battery module whose positioning lock is in
unlocked state into the cabinet, and turn the
positioning lock to the locked state.
4.
Install battery modules one by one from the bottom
layer to the top layer in the preceding way.

Advertisement

loading