NEC Express5800/R120e-2M User Manual page 130

Hide thumbs Also See for Express5800/R120e-2M:
Table of Contents

Advertisement

Chapter 2 Preparations
(2)
Installation
Mount the server to a rack in the following procedure.
1.
Pull the slide rail from left and right
outer rails until the it is locked.
2.
With two or more persons, firmly hold
the server and mount it to the rack.
3.
When the server is pushed into the
rack and is locked, push the server to
the end while pulling the release levers
(blue) on both sides of the server.
4.
Push the server until its lock on front
panel clicks.
130
Important
Always install the server with two or more persons.
Note
Make sure that locking mechanism work normally.
Express5800/R120e-2M User's Guide
Locked state
Locking mechanism
2. Installation and Connection
Release lever
レリーズバー

Advertisement

Table of Contents
loading

This manual is also suitable for:

N8100-2072fNec express5800 series

Table of Contents