Installation; Preparation; Installation Procedure; Tools Required - Motorola PTP 300 series User Manual

Hide thumbs Also See for PTP 300 series:
Table of Contents

Advertisement

7 Installation

Motorola recommends that only qualified personnel undertake the installation of a PTP 300 Series
Bridge solution.
We recommend that the practices and procedures detailed in the Motorola manual R56 'STAN-
DARDS AND GUIDELINES FOR COMMUNICATION SITES' (68P81089E50) be applied to all
new site build activities. For a copy on the manual please see your local Motorola representative.
The manual can be downloaded from the Motorola Intranet site http://compass.mot.com/go/190860869.

7.1 Preparation

Before proceeding with the installation you should:
Check the contents of all packages against the enclosed packing list.
Ensure that you have the correct tools for the job.
Ensure that you are qualified to undertake the work.
Ensure that you have taken the correct safety precautions.
Have completed the site planning as described in

7.2 Installation Procedure

The 300 Series installation procedure consists of the following steps:
Mounting the ODUs,
Connecting up,
Mounting the PIDU Plus Units,
PIDU Plus"
Mounting the Lightning Protection Units,
Powering Up,
Aligning the ODUs,

7.3 Tools Required

The following specific tools are required to install a PTP 300 Series Bridge in addition to general
tools:
13mm and 22 mm Spanner / Wrench
RJ45 Crimp Tool. Must be the tool specified for the RJ45 plugs being used.
IBM Compatible Personal Computer (PC) running Windows 98 or later with 10, 100 or
1000BaseT Ethernet (Ability to change IP settings easily is recommended)
Either Internet Explorer version 6 or higher, or FireFox 1.5 or higher are recommended.
Ethernet patch cable

7.4 Installation Support

Online installation support and contact details for your regional support can be found at
http://www.motorola.com/ptp.
A Frequently Asked Questions (FAQ) section can be found in
Section 7.6
"Mounting the ODUs"
Section 7.7
"Connecting Up"
Section 7.7.9
Section 7.7.10
"Powering Up"
Section 7.7.11
Installation
Section 6
"Mounting the PTP 300/500/600 Series Bridge
Section 7.7.5
"Fitting a Lightning Protection Unit".
"Aligning the PTP 300 Series Bridge ODUs"
Section 18
46
"Site Planning".
"FAQs".

Advertisement

Table of Contents
loading

Table of Contents