13. Disassembly
For dismantling work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Tools
•
e.g. adjustable spanner
Depressurise the compressed gas system or the respective system section and secure it against unintentional
1.
pressure build-up.
2.
Decommissioning has been completed.
D
E
50 | 60
Illustration
Original installation and operation manual
Prerequisites
Material
Preparatory tasks
Description / explanation
3. Close and disassemble the feed line [E].
H
4. Disassemble the discharge line [F].
G
F
Protective equipment
Always to be worn: