Connection Work; Voltage Supply Connection; Power Control Board Ac - Beko BEKOMAT 16 CO Original Installation And Operation Manual

Table of Contents

Advertisement

Original installation and operation manual

7.2 Connection work

For connection work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Tools
Stripping tool
Crimping tool for wire-end ferrules
Screwdriver - cross-head size
2.5 mm (0.09")
Screwdriver - flat-blade
size 2.5 mm (0.09")
1.
Assembly must have been completed.
Protect the cables for the voltage supply of the BEKOMAT
technical data.
2.
AC = 1 A (time-lag) recommended
DC = 1 A (time-lag) prescribed
In the case of AC voltage supply an accessible circuit breaker (e.g. power plug or switch) that shuts off all
3.
energised conductors must be installed close to the unit.

7.2.1 Voltage supply connection

7.2.1.1 Power control board AC

Illustration
2
Prerequisites
Material
3-wire cable for voltage supply
230 V
2-wire cable for voltage supply 24 V
2-wire cable for external test
2/3-wire cable for potential-free
contact
(depending on the application)
Wire end ferrules
Preparatory tasks
Description / explanation
4. Loosen the 4 pan-head screws [2] in the top cover
4
5
6
7
Protective equipment
Always to be worn:
in accordance with the specifications in the
®
and unscrew the components of the cable gland
[4, 5, 6, 7].
BEKOMAT
16 CO
®
25 | 60