7.3
Maintenance schedule
Carefully perform the maintenance according to the following points.
Posit
Activity
ion
Check display of SET and ACTUAL temperature.
1
Inspect operating pressure.
2
Inspect the volume flow rate.
3
Implement a general visual inspection. Pay attention to
unusual
occurrences,
4
malfunctions in ongoing operation.
Check the indicator light "H6". The indicator light is
5
inactive during normal operation.
Check the function of valves V1 and V2.
6
Function test of safety valves X4
Turn the release button counter-clockwise until a clear
blow out of the operating medium is audible.
Then turn the venting release knob clockwise until it
7
stops.
It is the duty of the operator to ensure that this work is
carried out only by authorised skilled technical
personnel.
Check that the nozzle X5 (see P & I diagramme) on the
rear side of the catalyst reactor is firmly and tightly
8
closed.
This nozzle is not available in all versions.
Analyse the compressed air quality at the outlet on the
®
BEKOKAT
.
9
We will be pleased to advise you how to do this.
V01 /11-046
Installation and Operation Manual BEKOKAT
damage
and
possible
Monthl
Annuall
Weekly
y
y
x
x
x
x
x
x
x
x
x