Adjustment Flow Chart After Cylinder Unit Replacement - Panasonic AJ-SD93P/E Service Manual

Digital video cassette recorder
Table of Contents

Advertisement

5-4. Adjustment Flow Chart After
Cylinder Unit Replacement
1.
After change the Cylinder Unit, please perform the
adjustment and confirmation as following flow
chart.
START Mechanical Adjustment (Section 3)
3-8. Tension Confirmation
3-11. Envelope Waveform Adjustment
3-12. Post Limit Confirmation
3-16. A/C Head Tilt Confirmation
3-17. A/C Head Height Confirmation
3-18. A/C Head Azimuth & X-value Adjustment
3-19. Compensation Adjustment of X Value
3-20. REV Tape path confirmation & Adjustment
3-21. CTL Self-Recording Level Confirmation
3-22.Play Tape Path Limit Confirmation
3-23. Envelope Waveform Confirmation
(REV/REW/FF)
3-24. Confirmation of Play Start Envelope
3-25. & 3-26. Tape Path Limit Confirmation
(REV/REW/FF)
3-27. Screw Lock Tight (A/C Head, T3 & T4 Post)
3-28. Tape Damage Confirmation
Note: Envelope level Adjustment
(PLAY)
(Long Play Type)
MECH-42
Note: PG Shifter Adjustment
3-29. LISTA Adjustment Procedure
3-30. LISTA Connection and Boot-up
3-32. RP Head Sensitivity Adjustment and
Sensitivity Detection (25M Mode)
3-33. LISTA Linearity Adjustment and Waving
Measurement (25M Mode)
3-34. PB Head LISTA Sensitivity Adjustment and
Sensitivity Detection (25M Mode)
3-35. RP Head Sensitivity Adjustment and
Sensitivity Detection (50M Mode)
3-36. LISTA Linearity Adjustment and Waving
Measurement (50M Mode)
3-37. PB Head LISTA Sensitivity Adjustment and
Sensitivity Detection (50M Mode)
3-38. RP Head (for DV) LISTA Sensitivity
Adjustment
3-39. Self-REC/PLAY ENV Confirmation
START Electrical Adjustment
EQ Adjustment
REC CURR & REC FREQ Adj.
NOTE:
Envelope
level
and
procedure are mentioned on Electrical Adjustment
Procedure on Service Manual.
END
PG
Shifter
adjustment

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aj-d93mcAj-ya93pAj-ya94g

Table of Contents