Test Operation - Panasonic DH-3MS1 Operating Instructions Manual

Electric home shower
Table of Contents

Advertisement

Available languages

Available languages

7. Shower Hanger installation.
① Install the Rail Holder so that the Shower
Head height not higher than the unit top.
Make sure the wall level must be same to the Rail
Holder fixing position. If the wall is not at the same
level, please use spacer (not included) to fix the
accessory.
Upper Rail Holder
Shower Head
Lower Rail Holder
④ Tighten the Shower Hanger with
Shower Hanger Knob.
Shower Hanger
Sliding Rail
Shower Hanger
Knob
Hole to fix Shower Head
Top
Bottom
* Shower Hanger will drop off easily
once the knob is loosen.

3. TEST OPERATION

3 TEST OPERATION
1. • Before switch "ON" electricity check the wiring.
• Switch "ON" the Miniature Circuit Breaker (MCB) and ON/OFF DP (double pole) Switch.
• Set the ELB of the unit to "On". (Push up the ELB Reset Lever if it is down)
• Push the ELB Test Button.
• It is normal if the ELB turns "Off" (the ELB Reset Lever falls) and push the ELB Reset Lever up.
Refer figure as shown.
• Inspection on the built-in ELB (once a month) to avoid a hazard to users such as damage to property, serious
injury or death.
If the ELB Reset Lever cannot be set even if you push it up or if it soon
slides down during operation, please do not use the unit and contact
WARNING
the authorized dealer immediately.
Never fix the ELB Reset Lever forcibly with tape, etc.
2. • Turn "On" the Main Water Valve.
• Turn clockwise the Water Volume Knob.
• Check if water leaks from the Pipe Line.
3. • Press the Push On-Off Lever once, the ELB lamp lights and water start flowing out of the Shower Head.
• Turn the Power Control Knob / Temperature Control Knob clockwise and hot water flows out. (Adjust to suitable water temperature.)
4. • Refer detail for HOW TO USE and WATER FLOW RATE ADJUSTMENT on page 15 & 16.
② Install the Upper Rail Holder on the wall but
not higher than the unit top.
Tighten the Upper Rail Holder with 1 screw.
Screw
Off
Upper Rail Holder
High
Temp Control
ELB Test
ELB Reset
Push On-Off
DH-3MT1
Push Up
⑤ Install to the Upper and Lower
⑥ Cover the Upper and Lower
Rail Holder with the Grooves
of the Sliding Rail inserted to
the Rail Holder's Notches.
Tighten the Lower Rail Holder
with 1 Screw (Make sure to
insert the Wall Plugs into the
screw hole).
Sliding Rail
Groove
Screw
Notch
- 21 -
③  P repare the Shower Hanger and Sliding Rail,
remove the Shower Hanger Knob by turning
it (anticlockwise) then install the parts
following the number (1), (2), (3) and (4).
Note: Make sure hole of Shower Hanger (1)
is align with hole of Shower Hanger (2) and
slot the Sliding Rail.
Shower Hanger
Knob
(4)
⑦ Adjust the Shower Hanger at the
Rail Holder with the Rail
required level and hang the Shower
Holder Covers.
Head as shown in diagram below.
Upper Rail Holder
Cover
Lower Rail Holder
Cover
Sliding Rail
(3)
(1)
Shower Hanger
(2)
Hole align
Shower Head
Shower Hanger
Tighten the Screw if
Shower Head moves
downward.
ELB
Test Button
Off
High
Temp Control
ELB
Control
ELB Test
Push On-Off
ELB Reset
DH-3MT1
Push Up
ELB
Reset Lever
Push

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Dh-3mt1

Table of Contents