Test Operation - Panasonic DH-3NS1 Operating Instructions Manual

Electric home shower
Table of Contents

Advertisement

Available languages

Available languages

3. TEST OPERATION

3 TEST OPERATION
1. • Before switch "ON" electricity supply check the wiring.
• Switch "ON" the Miniature Circuit Breaker (MCB) and ON/OFF DP (double pole) Switch.
• Set the ELB of the Unit to "On". (Push up the ELB Reset Lever if it is down)
• Push the ELB Test Button.
• It is normal if the ELB turns "Off" (the ELB Reset Lever falls) and push the ELB Reset Lever up.
Refer figure as shown.
• Inspection on the built-in ELB (once a month) to avoid a hazard to users such as damage to
property, serious injury or death.
If the ELB Reset Lever cannot be reset even if you push it up or if it soon slides down
during operation, please do not use the Unit and contact the authorized dealer
immediately to avoid a hazard to users such as damage to property, serious injury or
death. Never fix the ELB Reset Lever forcibly with tape, etc.
2. • Turn "On" the Main Water Valve.
• Turn clockwise the Water Volume Knob.
• Check if water leaks from the Pipe Line.
3. • Press the Push On-Off Lever once, the ELB lamp lights and water start flowing out of the Shower Head.
• Turn the Power Control Knob clockwise and hot water flows out. (Adjust to suitable water temperature.)
4. • Refer detail for HOW TO USE and WATER FLOW RATE ADJUSTMENT on page 21 and 22.
WARNING
- 30 -
ELB
Test Button
Off
High
ELB
ELB Test
Push On-Off
ELB Reset
Push Up
DH-3NS1
ELB
Reset Lever
Push

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Dh-3ns2Dh-3np2

Table of Contents