Huawei FusionDC1000A Commissioning Manual page 27

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:
Table of Contents

Advertisement

FusionDC1000A Prefabricated All-in-One Data
Center
Commissioning Guide (IT Scenario)
Syst
em
Issue 01 (2021-04-20)
Check
Operation Method
Item
Circuit
● Verify the circuit breaker
breaker
labels by referring to the
status
power supply and
distribution system
diagram.
● Verify that circuit breakers
can be smoothly switched
on and off.
● Check the circuit breaker
status.
Phase
Verify the phase sequences of
sequence
upstream and downstream
power distribution devices for
the FusionDC1000 using a
phase sequence meter.
Voltage
Use a multimeter to measure
the input voltage of the
Power PDB.
Frequency
Use a multimeter to measure
the input frequency of the
Power PDB.
Copyright © Huawei Technologies Co., Ltd.
3 Preparations for Power-On Commissioning
Expected Result
● Circuit breaker labels are
correct, clear, complete,
and attached properly.
● Ensure that all load
circuit breakers are
reliable and controllable.
● All PDF, PDB, and PDU
circuit breakers are in
the OFF state, and all
SPD circuit breakers are
in the ON state.
The phase sequences are
consistent.
The voltage is in the range
of 342–418 V.
● Frequency range for the
50 Hz scenario: 49–51
Hz
● Frequency range for the
60 Hz scenario: 59–61
Hz
21