Huawei FusionDC1000A Commissioning Manual page 29

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:
Table of Contents

Advertisement

FusionDC1000A Prefabricated All-in-One Data
Center
Commissioning Guide (IT Scenario)
Syst
em
Man
age
men
t
syst
em
Fire
exti
ngui
shin
g
syst
em
(CE)
Ligh
ting
syst
em
Issue 01 (2021-04-20)
Check
Operation Method
Item
Liquid
Check the liquid level detector
level
fastener.
detector
fastener
Smart
Check the connection of
cooling
smart cooling product
product
teamwork and signal cables.
teamwork
and signal
cables
Smart
Check the pipe connections
cooling
for the air-cooled precision
product
smart cooling products.
pipe
connectio
n
Componen
Check the monitoring device
t
installation and connection.
installatio
n and
connectio
n
Device
Check the fire extinguishing
installatio
device installation and cable
n and
connections.
cable
connectio
ns
Componen
Check the lighting device
t
installation and connection.
installatio
n and
connectio
n
Copyright © Huawei Technologies Co., Ltd.
3 Preparations for Power-On Commissioning
Expected Result
The liquid level detector
fastener has been removed.
Cables are securely
connected and meet the
design requirements.
The refrigerant circulation
pipeline, humidifier water
refill pipeline, and
condensate drainpipe are
properly installed, and the
thermal insulation layers
are intact.
● Devices are installed
securely as shown in the
monitoring device layout
diagram.
● Cables are correctly
connected.
● The pressure pointer of
the fire cylinder is in the
green zone.
● The dowel of the fire
cylinder is properly
installed and intact.
● All cables are correctly
and securely connected.
● Devices are installed in
positions shown in the
lighting device layout
diagram.
● Cables are correctly
connected.
23