Installing and connecting the device
3.1 Preparing for installation
3.1.2.2
Required clearance
The following clearance is required for sufficient self-ventilation around the built-in device:
• At least 15 mm to the right and left of the mounting cutout (in x direction) to allow for
insertion of the mounting clips during installation
• At least 50 mm above and below the mounting cutout (in y direction) for ventilation
• At least 10 mm behind the rear panel of the device (in z direction). The device depth in
the control cabinet is 63.4 mm.
The figure below shows the required clearances when the device is installed in landscape and
portrait format:
① Clearance for mounting in landscape format
② Clearance for mounting in portrait format
x
y
z
36
At least 15 mm distance
At least 50 mm distance
At least 10 mm distance
IFP V2, IFP V2 PRO, IFP V2 ETH
Operating Instructions, 03/2023, A5E46641410-AE