Siemens SIMATIC V2 Operating Instructions Manual page 59

Industrial flat panels
Table of Contents

Advertisement

Wiring diagram
The following figure shows the connection of the functional ground for the equipotential
bonding using IFP1500 V2 as an example and similarly applies to all Flat Panels and the
Transceiver Unit.
Note
Cable routing for PRO devices
As the PRO device is not installed in a control cabinet but on a pedestal or support arm, the
connecting cables must be routed through the support arm or the pedestal. The cable cross-
sections specified for the built-in devices also apply to the PRO devices.
Observe the corresponding connection diagrams in the Quick Install Guide supplied with your
PRO device.
IFP V2, IFP V2 PRO, IFP V2 ETH
Operating Instructions, 03/2023, A5E46641410-AE
Installing and connecting the device
3.5 Connecting the device
59

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic ifp v2Simatic ifp v2 proSimatic ifp v2 eth

Table of Contents