Notes For Installation; Notes For Installation - Hitachi YUTAKI ATW-YCC-03 Installation And Operation Manual

Cascade controller
Table of Contents

Advertisement

3.2.2 Notes for installation
The YUTAKI CASCADE CONTROLLER is designed in a way that wiring must be route through the
bottom side of the unit. Rubber bushing have been placed for such purpose. After routing the
cables through the rubber bushing, the cables should be placed in a simple manner inside the
Electrical box, so the identification should be easy and at first sight. Additionally, cables should be
fixed to the plastic cord located inside the Electrical box, before the TB1.
PMEN0581 rev.2 - 04/2023
Rubber bushing for power
supply wiring routing
Rubber bushing for control
wiring routing (x2)
3
14

Advertisement

Table of Contents
loading

Table of Contents