Lenovo RT5.0kVA Installation And User Manual page 36

3u rack or tower ups
Table of Contents

Advertisement

24
3U Rack or Tower UPS RT5.0kVA and RT6.0kVA Installation and User's Guide
1. Insert the Normal AC cable through the cable
gland.
2. Connect the three cables to the Normal AC
source terminal blocks.
3. Insert the Output cable through the cable gland.
4. Connect the three cables to the Output terminal
blocks.
5. Put back and secure the terminal blocks cover
with the screw.
6. Tighten the cable glands.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rt6.0kva5594-5kx5594-6kx5594-6bx

Table of Contents