Installing The Communication Card; Installation Requirements - Lenovo RT5.0kVA Installation And User Manual

3u rack or tower ups
Table of Contents

Advertisement

• Adjustment of the angle of vision of the LCD panel.

Installing the communication card

Follow these steps to install the UPS Network Management Card if it is not preinstalled.
Note: It is not necessary to shut down the UPS before installing the card.
Step 1. Remove the connector panel blank (
Step 2. Insert the UPS Network Management Card into the slot.Secure the panel by tightening the two
screws.

Installation requirements

Recommended protective devices and cable cross-sections
1. Recommended upstream protection
UPS power rating
5000VA
6000VA
), which is secured by two screws.
Upstream circuit breaker
D curve 30A or D curve RCD 30A, 300 mA leak current
D curve 30A or D curve RCD 30A, 300 mA leak current
21
.