Tower installation
To install the unit in a tower configuration:
Step 1.
Place the UPS on a flat, stable surface in its final location.
Step 2.
Always keep 150 mm of free space behind the UPS rear panel.
Step 3.
If installing additional units, place them next to the UPS in their final location.
Step 4.
Adjust the orientation of the LCD panel and the logo, as shown.
Step 5.
Adjust the angle of vision of the LCD panel., as shown.
Installing the communication card
Follow these steps to install the UPS Network Management Card if it is not preinstalled.
Note: It is not necessary to shut down the UPS before installing the card.