Tower installation

To install the unit in a tower configuration:
Step 1.
Place the UPS on a flat, stable surface in its final location.
Step 2.
Always keep 150 mm of free space behind the UPS rear panel.
Step 3.
If installing additional units, place them next to the UPS in their final location.
Step 4.
Adjust the orientation of the LCD panel and the logo, as shown.
Step 5.
Adjust the angle of vision of the LCD panel., as shown.

Installing the communication card

Follow these steps to install the UPS Network Management Card if it is not preinstalled.
Note: It is not necessary to shut down the UPS before installing the card.
24
6U Rack or Tower UPS RT8.0kVA and RT11.0VA and Maintenance Bypass Installation and User's Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rt11.0va

Table of Contents