5. Mount the UPS on rack.
6. Put back the battery packs, screw back the metal protection cover and the front
Rack mounting of the UPS and EBM
About this task
The UPS and connected EBMs must be installed no higher than 5 feet (1.5m) above
the floor to allow for easy installation and servicing.
Procedure
Follow steps 1 to 4 in the illustration for module mounting on the rails.
The rails and necessary hardware are supplied by Lenovo.
Tower installation
About this task
To install the unit in a tower configuration:
Procedure
1. Place the UPS on a flat, stable surface, in its final location.
2. Always keep 150 mm of free space behind the UPS rear panel.
3. If installing additional units, place them next to the UPS in their final location.
22
Installation and User's Guide
panel, then clip the center cover.