Motorola L6Q Installation Manual page 47

Hide thumbs Also See for L6Q:
Table of Contents

Advertisement

Figure 12: Dual Solar Panel Deployment
3.2.1
Assembling the Solar Panel
It is recommended to perform assembly of the solar panel at the L6Q installation site.
Prerequisites:
The Solar Panel Battery is fully charged.
For single solar panel deployments, obtain:
Solar Panel Kit
For dual solar panel deployments, obtain:
Solar Panel Kit
Expansion Solar Panel Kit
Expansion Solar Panel Battery Kit
For single solar panel deployments with an optional second battery, obtain:
Solar Panel Kit
Expansion Solar Panel Battery Kit
Procedure:
1 Stage the Solar Panel for assembly:
a Remove the top layer of foam from the product packaging and place it on a stable, flat
surface.
b Carefully lift the Solar Panel from the product packaging.
CAUTION: The assembled Solar Panel is heavy. Observe safe lifting practices when
moving the panel.
c Place the Solar Panel onto the foam sheet panel-side down, to protect the surface while
working.
2 Secure the Shoulder Strap to the Solar Panel.
a Obtain the Shoulder Strap from the Solar Panel Kit.
MN010089A01-AB
Chapter 3 : Hardware Installation
47

Advertisement

Table of Contents
loading

Table of Contents