Motorola L6Q Installation Manual page 50

Hide thumbs Also See for L6Q:
Table of Contents

Advertisement

MN010089A01-AB
Chapter 3 : Hardware Installation
If...
If the Solar
Panel is being
mounted to a
flat surface,
2 Lift the Solar Panel by the Shoulder Strap and bring it to the mounting location.
CAUTION: The assembled Solar Panel is heavy. Do not attempt to ascend a ladder with
additional items while mounting the Solar Panel.
3 Hook the Solar Panel over the top of the mounting bracket hook and into the top of the mounting
bracket.
CAUTION: Ensure that both the Solar Panel hook and the Mounting Bracket hook are
engaged.
4 Obtain the Hex Bolts (2x) and Hex Key Tool.
5 Thread the Hex Bolts (2x) through the mounting holes at the top of the Solar Panel and into the
mounting bracket.
6 Securely tighten the Hex Bolts (2x) with the Hex Key Tool.
7 Choose one of the following options:
If...
If this is dual Solar
Panel deployment,
If this is a single Solar
Panel deployment,
50
Then...
c Loop the Metal Band Straps through the mounting loops to secure the
bracket against the pole.
d Fasten the straps with the Hex Key Tool.
e Remove the temporary Zip-Tie.
f
Trim the excess material from the Metal Band Straps.
install the Solar Panel Mounting Bracket with two Lag Bolts:
a Ensure that the mounting surface is flat, and that the surface material
is capable of supporting the full weight of the assembled Solar Panel.
b Insert a drill bit into the Power Drill chuck.
c Hold the bracket against the surface with the hook facing away from
the surface.
d Adjust the bracket to its final mounting location and tap two mounting
holes through the lag bolt holes.
e Equip the Power Drill chuck with a socket bit and Lag Bolt.
f
Screw the Lag Bolts through the bracket and into the surface.
g Tighten the Lag Bolts securely.
Then...
perform the following actions:
a Repeat the Solar Panel mounting process in
Expansion Solar Panel.
b Connect the two remaining connectors on the Y-cables to the
power cables on the Expansion Solar Panel.
c Perform cable management as necessary.
d Go to
Camera
go to
Camera
Installation.
Installation.
step Step 1
for the

Advertisement

Table of Contents
loading

Table of Contents