Huawei iSitePower-M Quick Manual
Huawei iSitePower-M Quick Manual

Huawei iSitePower-M Quick Manual

Hide thumbs Also See for iSitePower-M:

Advertisement

Quick Links

iSitePower-M (MAP05A1, MAB05B1)
Quick Guide
Issue: 05
Part Number: 31500GRU
Date: 2023-04-15
HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei iSitePower-M

  • Page 1 (MAP05A1, MAB05B1) Quick Guide Issue: 05 Part Number: 31500GRU Date: 2023-04-15 HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.
  • Page 2: System Description

    (O) Automatic voltage √ √ × × × × regulators (Q) AC switch √ √ √ √ √ √ Note: √ indicates supported and × indicates not supported. Copyright © Huawei Digital Power Technologies Co., Ltd. 2023. All rights reserved.
  • Page 3 Parallel System Note: Dashed boxes indicate optional configuration Device PV+ESS Mains PV+Mains PV+Gense Mains+Ge PV+Mains+ +ESS +ESS t+ESS nset+ESS Genset+ESS (A) PV string √ √ √ √ × × (B) DC switch √ × √ √ × √ (C) AC Parallel Box √...
  • Page 4 Recommended battery configuration Maximum capacity: In a single-node system, a maximum of six battery modules can be • connected. In a parallel system, a maximum of three power modules can be connected. Each power module can connect to a maximum of three battery modules. In a parallel system, three routes of single-phase output can be combined but they cannot •...
  • Page 5: Power Module

    Overview iSitePower-M The iSitePower-M is a fuel-free hybrid power solution for areas with no or poor mains supply. LED indicator Heat sink Power module Decorative cover Note: The 15 kWh model Battery is used as an example. modules Base Power Module...
  • Page 6: Battery Module

    Battery Module AC Parallel Box Left view Right view (1) Ground point on the door (1) Alignment boss (2) COM port (2) Ground bar (3) Cable bags (3) Terminals for battery module cascading (4) AC input circuit breaker (5) N wiring terminal (4) Heat sink (5) Ground points (6) AC output circuit breaker...
  • Page 7 • The installation and usage environment must meet relevant international, national, and local standards for lithium batteries, and are in accordance with the local laws and regulations. The user is obliged to protect the battery against fire or other hazards. •...
  • Page 8: Installation Tools

    Installation Tools Insulated torque socket wrench Hammer drill Adjustable torque Diagonal pliers Wire stripper (including an wrench extension bar) Phillips insulated Flat-head insulated Rubber mallet Utility knife Cable cutter torque screwdriver torque screwdriver Crimping tool, Removal tool model: PV-CZM- Cord end terminal (model: PV-MS-HZ Cable tie Vacuum cleaner...
  • Page 9: Installation Dimensions

    Installation Dimensions Top view Installing a Mounting Bracket Ground Mounting Two marking out templates are The base must be secured to the ground using required for ground mounting. A bolts. Otherwise, the device may tip over, small marking out template causing personal injury or device damage.
  • Page 10: Wall Mounting

    3. Mark the mounting holes 4. Drill holes and install expansion bolts. for battery modules. Wall Mounting 1. Mark the mounting holes 2. Drill holes and install expansion bolts. for the wall-mounting base and battery modules.
  • Page 11: Installing Modules

    3. Install the wall-mounting base. Installing Modules Installing Battery Modules and Power Modules This section describes how to install • Two persons are required to move a module. modules in the ground mounting scenario. • Battery modules must be secured to the wall. 1.
  • Page 12 3. Install a wall-mounting base cover. In the wall-mounting scenario, install battery modules before installing the wall-mounting base cover. 4. Install the remaining battery modules and power module from bottom to top. Each time a module is installed, tighten the screws on the left and right, and then secure it against the wall.
  • Page 13 5. Open the power module maintenance compartment and set the address DIP switch. Scenario Address DIP Switch Pin 1 (M/S) Pin 2 (A) Pin 3 (B) Pin 4 (C) Single product Master Parallel Slave 1 products Slave 2 (Optional) Installing Battery Modules for Capacity Expansion One bracket supports a maximum of three battery modules.
  • Page 14 3. Install the top cover on the battery module. (Optional) Installing a 4G Wireless Backhaul Module 1. Install a SIM card to the 4G wireless backhaul module. If you hear two clicks when installing a 4G backhaul module, the module is properly •...
  • Page 15: Preparing Cables

    Installing Cables • Connect cables in accordance with local installation laws and regulations. • Before connecting cables, ensure that the DC SWITCH on the power module and all the switches connected to the power module are set to OFF. Otherwise, the high voltage of the system may result in electric shocks.
  • Page 16 Installing Ground Cables • Ensure that the ground cables are installed securely. Inappropriate grounding may cause device damage and personal injury. • Connect the ground point of the power module to the ground bar, and then connect equipotential cables between modules. •...
  • Page 17 AC switches (with a capacity of 40 A) must be installed for phases L and N of the iSitePower- M AC input. The AC switches are delivered with the iSitePower-M. Do not use a Type D circuit breaker because it cannot effectively protect products.
  • Page 18 Installing PV Input Power Cables 1. Use a wrench to remove the waterproof gland from the PV input terminal on the power module. 2. Install the PV input power cables. Take the disassembly wrench out of • the decorative cover. Prepare cable terminals by referring to •...
  • Page 19 Capacity Expansion Scenario • In capacity expansion scenarios, you need to separately purchase bottom cascading cables from Huawei Digital Power. In capacity expansion scenarios, cascading cables at the lower part must be routed from the • rear of the product.
  • Page 20 Installing Battery Module Communications Cables When a communications terminal is connected to a single network cable, the waterproof rubber plug must be installed for the hole with no cable routed. Otherwise, the waterproof performance may be affected and the device will be damaged. 1.
  • Page 21 Capacity Expansion Scenario Waterproof gland Waterproof Locking cap rubber plug Build-out resistor Install the waterproof rubber plug for the hole with no cable routed. • In capacity expansion scenarios, cascading cables at the lower part must be routed from the rear of the product.
  • Page 22 Installing a Genset Control Signal Cable For a generator set (genset) that starts when the dry contact is open, connect the signal • cable to ports NC and COM. For a genset that starts when the dry contact is closed, connect the signal cable to ports NO and COM.
  • Page 23 Parallel Connection Scenario Setting the DIP Switch Power on the iSitePower-Ms and set the same output parameters for the master and slave products. Power off the iSitePower-Ms and set address DIP switches for the master and slave products. Scenario Address DIP Switch Pin 1 (M/S) Pin 2 (A) Pin 3 (B)
  • Page 24 Installing an AC Parallel Box The AC parallel box is used for paralleling of power modules to increase the system power. A maximum of three power modules can be connected in parallel. 1. Mark mounting holes. 2. Install expansion bolts. 4.
  • Page 25 (L/N/PE) Cable from the parallel box to the Outdoor three-core 4–6 mm 13.7–16.9 mm AC input port of the iSitePower-M copper cable (L/N/PE) Cable from the AC output port of Outdoor three-core 4–6 mm 13.7–16.9 mm...
  • Page 26 Installing AC Output Power Cables in a Parallel System • Install a short-circuit plate for AC output circuit breakers. • The three cables from the AC output circuit breakers to the power modules must be of the same length. Short-circuit plate Power distribution box (PDB)
  • Page 27 AC switches (with a capacity of 40 A) must be installed for phases L and N of the iSitePower- • M AC input. The AC switches are delivered with the iSitePower-M. Do not use a Type D circuit breaker because it cannot effectively protect products.
  • Page 28: Verifying The Installation

    Verifying the Installation Verifying the Installation Expected Result The installation is correct and reliable. Cables are routed properly as required by the customer. Cable ties are evenly spaced, and no sharp burrs are left at the cut points. Power cables, signal cables, and ground cables are connected correctly and securely. The DC SWITCH and all switches connected to the product are OFF.
  • Page 29: Follow-Up Procedure

    Follow-up Procedure 1. Close and lock the maintenance compartment door. 2. To facilitate cabling, cut off part of the decorative cover as required. Right decorative cover Left decorative cover 3. Route the cables out of the cable holes. The outlet positions shown in the figure are for reference only.
  • Page 30: Power-On Commissioning

    4. Tighten the screws. Power-On Commissioning Powering On the System Overview • The product must be powered on within 24 hours after being unpacked. During maintenance, the power-off time cannot exceed 24 hours. • Before the first power-on, press the manual ON/OFF switch. Set the DC SWITCH of the power module and the AC input switch to ON.
  • Page 31: Downloading And Installing The App

    Downloading and Installing the App Method 1: Search for FusionSolar on Huawei AppGallery and download the latest installation package. Method 2: Scan the following QR code and download the latest installation package. Overview The app supports only mobile phones running Android 8.0 or later.
  • Page 32 Appendix Preparing Terminals Preparing a Cord End Terminal (1) Cable (2) Cord end terminal (3) Crimping tool Preparing an OT Terminal (1) Cable (2) OT terminal (3) Heat-shrink tubing (4) Hydraulic pliers (5) Heat gun Preparing PV Input Terminals • A PV-CZM-41100 crimping tool is recommended.
  • Page 33 Huawei Digital Power Technologies Co., Ltd. Huawei Digital Power Antuoshan Headquarters, Futian Shenzhen 518043, People's Republic of China solar.huawei.com...

This manual is also suitable for:

Map05a1Mab05b1

Table of Contents