Power-On Sequence - Fujitsu F2MC-16L Hardware Manual

Emulator
Hide thumbs Also See for F2MC-16L:
Table of Contents

Advertisement

3.8

Power-On Sequence

After making all necessary connections and settings, power on the host machine,
emulator, and user system in this sequence.
For the first use of the emulator after shipment, the emulator must be initialized
(monitor loading) before the power-on sequence of the user system.
I Power-on sequence
CAUTION
Prohibition
Figure 3.8-1 "Power-on sequence" shows the sequence of power-on operations. Perform the
power-on operations in this sequence after making all necessary connections and settings.
To turn on the emulator, push the POWER switch on the back panel of the emulator (see Figure
1.2-3 "Rear view of the emulator unit" for the location of the POWER switch). The POWER
switch is then locked in the ON position (pushed in).
For the first use of the emulator after shipment, the emulator must be initialized (monitor
loading) before the power-on sequence of the user system. For information on how to initialize
it, see the Softune Workbench Operation Manual.
Follow the procedure described in the manual to turn on the product.
Doing so may result in device problems.
After power is turned on to the product, do not move the system, or
apply any shock or vibration to it. Doing so may result in device
problems.
Get other manuals https://www.bkmanuals.com
3.8 Power-On Sequence
47

Advertisement

Table of Contents
loading

This manual is also suitable for:

F2mc-16lx

Table of Contents