Clearance; Tools & Safety Gear Required; Appearance And Dimensions; System Clearance - LG HBP 16H Installation Manual

Table of Contents

Advertisement

3.1.5

Clearance

Ceiling
500 mm
(20")
300 mm
300 mm
(12")
(12")
Floor
3.1.6
Tools & Safety Gear Required
Tools
The following tools are required to install the battery pack :
Precision screwdriver
M5 torque wrench
Drill
Pencil or marker
(min. diameter 10 mm, 0.4")
Safety Gear for Personal Protection
It is required to wear the following safety gears when handling the battery pack.
Insulated gloves
Safety goggles
3.1.7

Appearance and Dimensions

Appearance
Proper handling and care are recommended as disassembly, change of color,
battery pack.
Pack appearance and dimensions
1,086 mm
(42.8")
504 mm
295 mm
(19.8")
(11.6")
Recommended clearances for the left,
right and top of the product are shown in
installer convenience.
Inclinometer
Tape measure
Safety shoes
Color and materials
- Battery Module front/rear case:
metallic gray, steel
- Battery Control Unit cover &
Module Connect Plate: metallic gray,
aluminum
- LED cover: black, plastic
3.1.8

System Clearance

pack and inverter should be in accordance with the installation guide manual of the inverter.
NOTE
An external DC isolator may be installed within the clearance zone. Minimum clearances
may be greater according to local regulations.
Ceiling
500mm
(20")
300mm
(12")
Floor
3.1.9

Installing the Battery Pack

CAUTION
power cable to the battery pack.
Install the battery pack through the following steps:
Area1
Area2
Ex) If min. clearance is 200 mm,
Wall
Ok
203 mm
305 mm
Ok
Front
Wall
direction
300mm
(12")
Inverter
1. Place the Drill template to the wall
where the battery pack will be
installed. After that, drill holes on the
position marked on the Drill template.
* Recommended fastener count:
1(Area1)/1(Area2)
* Recommended fastener diameter/
length: 10mm/40mm Min.
* Fastener separation should observe
the regional building code.
2. Place a spacer to the position marked
on the Drill template. After that, place
the Module connect plate in contact
with the Spacer and align center lines.
* Pay attention to the direction of
the Spacer. Refer to left image for
correct orientation.
*
* Be careful not to damage the
aluminum foil attached on the
bottom of Module connect plate
during handling.
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Blgresu16hp

Table of Contents