LG HBP 16H Installation Manual page 8

Table of Contents

Advertisement

Standing bracket 1
Battery Module B
Label
Wall
Battery Module Direction
Battery Module A
Label
Wall
Battery Module B
Rear
Front
Battery Module A
TOP VIEW
Module Support BRKT
8
3. Remove the Drill template. Then pre-
tighten the fasteners on the Standing
Bracket 1.
* The fasteners will be fully tightened
in a later step.
4. Place Battery Module B on the rear
side of Module Connect plate.
* The side without bolts is the front
of the Battery Module.
*
battery pack is of B. Label is
attached on the left side of Battery
Module.
5. Place Battery Module A on the front
side of Module Connect plate. The
Rear side of each Battery Module
should face each other. After that,
remove the Spacer between the wall
and Battery Module.
*
Battery pack is of A. Label is
attached on the left side of Battery
Module.
6. Assemble Module Support BRKTs
using 6 bolts each.
* Tighten the M6 Flange Bolts (x12)
with a torque of 5N·m.
Battery Control Unit
Battery Modules
Spacer
Spacer
TOP VIEW
Battery Control Unit
Sensing connector
Power connector
"Click!"
TPA
7. Remove bubble wrap from
connectors of Battery Control Unit
and the warning label of Battery
Modules.
8. Place the spacers on the position
marked with label on Battery
Modules.
9. Place the Battery Control Unit on
top of the spacers, and align with the
Battery Module.
* Be careful not to break the
connector between the spacers and
the Battery Control Unit.
10. Connect the power and sensor
connectors on the right and left sides
(2 each). Assemble the connectors
until you hear a "Click". After that,
lock the power connector by pressing
TPA (Terminal Position Assurance).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Blgresu16hp

Table of Contents