LG BLGRESU10HP Installation Manual page 11

Residential battery unit
Hide thumbs Also See for BLGRESU10HP:
Table of Contents

Advertisement

3.1.9.2 Wall Mounting Type (Optional)
Wall
Wall
Rear
Front
Top View
Wall
Bottom View
Battery
Module B
Label
Wall
Battery Module Direction
11
1. Place the Drill template to the wall
where the battery pack will be
installed. After that, drill holes on the
position marked on the Drill template.
* The number of fastener should
observe the regional building code.
LGES recommends the use of at
least 8 fasteners for Wall Mounting
Bracket Bottom and 2 fasteners for
Wall Mounting Bracket Top.
* Check "LG HBP 10H Wall
Mounting (Optional)" on the
middle side of Drill Template
before drilling.
2. Fix the Wall Mounting Bracket
Bottom and Wall Mounting Bracket
Top on the wall.
3.
Plate on the Wall Mounting Bracket
Bottom using eight (8) M6 Flange
Bolts.
* Tighten the M6 Flange Bolts with a
torque of 5Nm.
4. Place Battery Module B on the rear
side of Module Connect plate.
* The side without bolts is the front
of the Battery Module.
*
battery pack is of B. Label is
attached on the left side of Battery
Module.
Battery Module A
Label
Wall
Battery Module B
Rear
Front
Battery Module A
TOP VIEW
Module Support BRKT
Battery Control Unit
Battery Modules
Spacer
Spacer
TOP VIEW
5. Place Battery Module A on the front
side of Module Connect plate. The
Rear side of each Battery Module
should face each other.
*
Battery pack is of A. Label is
attached on the left side of Battery
Module.
6. Assemble Module Support BRKTs
using 6 bolts each.
* Tighten the M6 Flange Bolts (x12)
with a torque of 5N·m.
7. Remove bubble wrap from
connectors of Battery Control Unit
and the warning label of Battery
Modules.
8. Place the spacers on the position
marked with label on Battery
Modules.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ess hbp 10h

Table of Contents