7. Appendix

7.1 Connection in BLG RESU10HP parallel battery system

CAUTION
Parallel battery system can only be applied between products of the same energy.
7.1.1
Setting for communication termination resistor (About Section
B)
Section A
Section B
When you install the pack as primary, Turn ON the DIP switch for communication termination
resistor.
When you install the pack as secondary, Turn OFF the DIP switch for communication
termination resistor.
(already have)
Inverter
Terminating
resister ON
Primary
Pack
23
Section C
Section D
Section E
1. Case 1 : When installing one battery
pack, Turn ON the DIP switch for
communication termination resistor.
(It is ON when switches are lowered.)

7.2 RMD Applications

How to check the battery status is as follows.
First, proceed with RMD Wi-Fi direct connection as shown below.
Search and access the SSID of the RMD AP from a device (hereinafter referred to as a device)
supporting WLAN Station functions such as a smartphone.
RMD SSID has a structure of "RESU_ (or RMD) + RMD WLAN STM MAC ADDRESS".
For the devices below, the SSID of the RMD SoftAP is "RESU_44CBXXXC14F (or
RMD44CBXXXC14F)". The password is 12345678(changeable)
2) RMD Web page access
1. Start a web browser on the device and enter 192.168.4.1 in the address bar. If the
following screen is displayed after input, you have successfully connected to the
RMD web server.
2.
3. The default password is set to 123456 and can be changed in the Web UI.
3) Battery Status Check