Beko BEHPGH 090 User Manual page 45

Hide thumbs Also See for BEHPGH 090:
Table of Contents

Advertisement

Available languages

Available languages

9
Outdoor unit installation
7. Insulate unused wires with PVC electrical tape.
Arrange them so that they do not touch any
electrical or metal parts.
8. Replace the wire cover on the side of the unit,
and screw it in place.
Note: If the cable clamp looks
C
like the following, please select
the appropriate through-hole
according to the diameter of the
wire.
Three size hole: small, large, medium
When the calbe is not fasten enough, use the
buckle to prop it up, so it can be clamped tightly.
In North America
1. Remove the wire cover from the unit by
loosening the 3 screws.
2. Dismount caps on the conduit panel.
3. Temporarily mount the conduit tubes
(not included) on the conduit panel.
4. Properly connect both the power supply
and low voltage lines to the corresponding
terminals on the terminal block.
Split type air conditioner / User Manual
Cover
Screw
Buckle
5. Ground the unit in accordance with local codes.
6. Be sure to size each wire allowing several
inches longer than the required length for
wiring.
7. Use lock nuts to secure the conduit tubes.
Terminal block
Wire Cover
Please select the appropriate through-hole
according to the diameter of the wire.
Connecting cable
Conduit panel
45 / 128 EN

Advertisement

Chapters

Table of Contents
loading

Table of Contents