Handling Hydraulic System - Komatsu GALEO PC40MR-2 Operation & Maintenance Manual

Hydraulic excavator
Table of Contents

Advertisement

LUBRICANTS, COOLANT AND FILTERS

HANDLING HYDRAULIC SYSTEM

Hydraulic equipment is at a high temperature during operations and immediately after operations. During
operations, it is also under high pressure, so be careful of the following points when carrying out inspection and
maintenance of hydraulic-related equipment.
Stop the machine on level ground, lower the bucket completely to the ground, and set so that there is no
pressure on the cylinder circuits.
Always stop the engine.
Immediately after the engine is stopped, the hydraulic oil and lubricants are at a high temperature and high
pressure. Wait for the temperature to go down before starting the maintenance operation.
Even when the temperature goes down, the circuits may be under internal pressure, so when loosening plugs,
screws, or hose connections, do not stand directly in front. Loosen gradually to release the internal pressure
before removing.
Always release the air in the hydraulic tank to remove the internal pressure before carrying out inspection and
maintenance of the hydraulic circuit.
Inspection and maintenance works include checking the hydraulic system for oil level, replacement of filter
elements and replacement of hydraulic oil.
If high-pressure hoses have been removed, check that there is no damage to the O-rings. If any damage is found,
replace the O-ring.
It is necessary to bleed the air from the circuits when the hydraulic filter element or strainer have been replaced
or washed, or when hydraulic equipment has been repaired or replaced, or when the hydraulic piping has been
removed.
4 - 8
MAINTENANCE

Advertisement

Table of Contents
loading

This manual is also suitable for:

Galeo pc40mrx-2Galeo pc50mr-2Galeo pc50mrx-2

Table of Contents