MAINTENANCE
.MAINTENANCE PROCEDURE
(5) Boom - Arm coupling pin (1 point)
(6) Arm cylinder rod end (1 point)
(7) Bucket cylinder foot pin (1 point)
(8) Arm-Link coupling pin (1 point)
(9) Arm-Bucket coupling pin (1 point)
(10) Link coupling pin (2 points)
(11) Bucket cylinder rod end (1 point)
(12) Bucket-Link coupling pin (1 point)
LUBRICATE SWING CIRCLE
0.
1. Lower the work equipment to the ground.
2. Using a grease pump, pump in grease through the grease
fittings shown by arrows.
3. After greasing, wipe off any old grease that was pushed out.
4-45