8-5-10 Replacement of the UBE To OPIO HUB USB 3.0 Cable

This table includes information specific to these instructions. For more information
for servicing the LOGIQ Totus" on page 8-5 /8-2-7 "PPE Required During Service" on page
Table 8-28
Manpower
One person
8-5-10-1
Preparations
1.) Power off/Shutdown the system as described in
2.) Remove the OPIO Top Cover Set-T as described in
Set-T" on page 8-89
3.) Remove the UOPIO-T Assy as described in
8-98
4.) Remove the Elevation Arm Cover Set-U as described in
Cover Set-U" on page 8-148
5.) Remove the Top Cover Assy-T as described in
page 8-145
6.) Remove the T2 Side Cover R Assy as described in
Assy" on page 8-136
GE HealthCare CONFIDENTIAL
. 1
Manpower, Time, Tools, and PPE
Time
Approximately 30 minutes
Section 8-5 - Replacing Cables
LOGIQ T
Tools
Phillips screwdriver
Nipper
1-7-2 "Lockout/tagout procedure" on page 1-25
8-7-2 "Replacement of the OPIO Top Cover
8-7-10 "Replacement of the UOPIO-T Assy" on page
8-8-20 "Replacement of the Elevation Arm
8-8-17 "Replacement of the Top Cover Assy-T" on
8-8-8 "Replacement of the T2 Side Cover R
Basic Service Manual
OTUS
8-2-6 "Tools needed
8-6.
PPE
Cut resistant gloves
Knee Pad
8 - 59

Advertisement

Table of Contents
loading

Table of Contents