8-5-13 Replacement Of The Opio Hub To Monitor Usb 2.0 Cable - GE LOGIQ Totus Basic Service Manual

Table of Contents

Advertisement

D
5936427, R
IRECTION
EV

8-5-13 Replacement of the OPIO HUB To Monitor USB 2.0 Cable

This table includes information specific to these instructions. For more information
for servicing the LOGIQ Totus" on page 8-5 /8-2-7 "PPE Required During Service" on page
Table 8-31
Manpower
One person
8-5-13-1
Preparations
1.) Power off/Shutdown the system as described in
2.) Remove the T1 Monitor Arm Cover Set as described in
Cover Set" on page 8-74
3.) Remove the OPIO Top Cover Set-T as described in
Set-T" on page 8-89
4.) Remove the UOPIO-T Assy as described in
8-98
8-5-13-2
Removal Procedure
1.
Remove the Monitor Cable Cover.
2.
Unscrew 2 screw and Remove the plastic clamp from
OPIO HUB To Monitor Power Cable and disconnect
the OPIO HUB To Monitor Power Cable from the
Monitor.
Note: If the HDU 23.8 inch Monitor LOGIQ Exx was
installed, remove the HDU 23.8 inch Monitor LOGIQ
Exx as described in
HDU 23.8 inch Monitor LOGIQ Exx" on page 8-
86
3.
Cut 4 Cable Ties.
8 - 70
GE HealthCare CONFIDENTIAL
. 1
Manpower, Time, Tools, and PPE
Time
Approximately 15 minutes
Steps
8-6-7 "Replacement of the
Section 8-5 - Replacing Cables
LOGIQ T
Tools
Phillips screwdriver
Nipper
1-7-2 "Lockout/tagout procedure" on page 1-25
8-6-2 "Replacement of the T1 Monitor Arm
8-7-2 "Replacement of the OPIO Top Cover
8-7-10 "Replacement of the UOPIO-T Assy" on page
Corresponding Graphic
Basic Service Manual
OTUS
8-2-6 "Tools needed
8-6.
PPE
Cut resistant gloves
Knee Pad

Advertisement

Table of Contents
loading

Table of Contents