16. As the breaker approaches the TEST position, check the alignment of the fixed and
moving parts of the secondary disconnect contacts. If a spring charging motor or under
voltage-release is installed, these may operate when approaching the TEST position.Fig
42
17. Continue rotating the racking handle clockwise until the position indicator first shows
TEST, then CONNECTED. Fig 42
NOTE: When approaching the CONNECTED position, more torque for turning the racking
handle is normal as the primary finger clusters engage with the AKD-8 or OEM
substructure primary bus stabs.
NOTE: At the end of 37 rotations, the breaker is in its maximum travel position. At this point,
the primary disconnect fingers have completely engaged with the primary bus stabs.
18. Remove and store the racking handle in it storage location. Fig 39.
26-
AKD-8: Racked-In
The photo below shows one example of a racked-in AKD-8 Retrofill.
Emax 2 Retrofill 800, 1600 & 2000A Frames
Figure 43
2TSA451009P0000 Rev-B
©2020 Emax 2 Retrofill Circuit Breakers 800-5000A | 35