Brother BAS-311E Service Manual page 65

Programmable electronic pattern sewer with cylinder bed e series
Hide thumbs Also See for BAS-311E:
Table of Contents

Advertisement

311E, 311EL
y
!3
w
326E, 326EL
y
w
5. When installing the feed plate y, use a 2 mm- diameter
pin !3 (such as a needle) to align the hole in the needle
plate w with the hole in the feed plate w when the ma-
chine is at the home position, and then tighten the bolts
t
t.
* How to determine the mechanical home position
a. Connect the programmer to the operation panel.
b. Plug the cord into the wall socket, and turn on the
c. Press the P key on the programmer to determine the
t
!3
BAS-311E.311EL.326E.326EL
Chapter 4. Adjustments
power.
mechanical home position.
57

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bas-326eBas-311elBas-326el

Table of Contents