Power Up The Components In The Rack; Power Up Sequence - HP D7171A - NetServer - LPr Manual

Rack cabling reference
Hide thumbs Also See for D7171A - NetServer - LPr:
Table of Contents

Advertisement

Chapter 2
Figure 2-13. Forming the LH 4r Cable Management Loop

Power Up the Components in the Rack

Follow the Power Up Sequence to minimize initial surge currents and prevent
breakers from tripping.

Power Up Sequence

1. Ensure that the mass storage unit DIP switches are set for SCSI ID spin-
up order. See documentation included with the unit for more information.
2. Power on the tape back-up unit, if one is present.
3. Power on the mass storage units, one at a time.
4. Power on the monitor.
42
Connecting and Routing Cables to the HP NetServer LH 4r

Advertisement

Table of Contents
loading

Table of Contents