2 Getting Started "Configured Mode"
3
If you want to prevent project engineering data from being transferred online at a later point in
time, select the "Work offline..." option...". The default is that project engineering data can be
transferred online.
Tip:
You can also follow this procedure in the example "OPC Configuration for Industrial
Ethernet" in this manual; see Section 7.
Where to we go from here?
you can now use the other tools from SIMATIC NET for diagnostics,
commissioning, and testing.
See also Section 1.3.
38
How to Make the "Initial Configuration with an XDB File"
Result:
PC station is ready for productive communication
S
Module addresses are set;
S
Communication connections configured in the project engineering
are established;
S
Variables can be accessed using symbols configured in the project
engineering.
Commissioning PC Stations - Manual and Quick Start
C79000-G8976-C156-07
Release 5/2005

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic net commissioning pc stations

Table of Contents