LG ARNH963K2A2 Installation Manual page 42

Hydro kit medium temperature (k2) btu/h 107,500; hydro kit high temperature (k3) btu/h 86,000
Hide thumbs Also See for ARNH963K2A2:
Table of Contents

Advertisement

fINIsH-uP
Accessory Installation
Independent Power Module (K2) - continued
• Incorrect wiring will lead to malfunction or damage of the independent power kit.
• Maintain 20 minutes of continuous power to the power module kit to ensure that EEV can close properly. This ensures that EEV is fully charged.
Refer to the Independent Power Module Installation Manual for more detailed information regarding this system.
1. Turn power off at circuit breaker.
2. Disconnect the cable harness plug from the socket tagged cN-eeV.
3. Connect the Independent power module wire harness tagged cN-eeV/loaD to the Hydro Kit EEV valve.
4. Connect the Independent power module dual plug wiring harness #2 tagged cN-eeV/MaIN) to the Hydro Kit's PCB board sockets tagged
cN-eeV and cN-WrIte.
5. Replace the control panel cover and unit cabinet access panel.
6. Restore power to the Hydro Kit.
42
Figure 35: Power Module Wiring Termination Detail
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG Life's Good" is a registered trademark of LG Corp.
CN-WRITE
Harness
CN-EEV
Harness
1
2
2
EEV
CN_EEV/MAIN
CN_EEV/LOAD
1
To Hydro Kit's EEV

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Arnh763k3b2

Table of Contents