Chapter 2 - Setup Process; Check That All Necessary Components Are Present; Assemble The Required Tools For Setup - Hitachi GR2000-B Series Quick Start Manual

Hitachi gigabit router quick start guide
Hide thumbs Also See for GR2000-B Series:
Table of Contents

Advertisement

This chapter explains briefly about the whole process from unpacking a product
package to powering up the GR2000-B.
„
2.1, "Check that All Necessary Components are Present," on page 2-1
„
2.2, "Assemble the Required Tools for Setup.," on page 2-1
„
„
„
„
„
„
2.8, "Software," on page 2-10
„
„
2.1

Check that All Necessary Components are Present

Before you unpack the GR2000-B, find the packing list and check the contents of the
box against the list. Make sure that all components are present before you begin the
setup process.
2.2

Assemble the Required Tools for Setup.

Make sure you have the following tools before you begin setup. The only tools
required to install and set up a GR2000-B router are:
„
A #2 Phillips screwdriver for attaching the GR2000-B to a rack
„
A medium-sized flat-blade screwdriver for attaching cables.
GR2K-GA-0008
Rev. 1.00
Chapter 2
Setup Process
2-1

Advertisement

Table of Contents
loading

Table of Contents