Step
Task (continued)
Route the terminated cables down and toward the rack rail, as shown below.
7
Figure 8-5. Connecting the Ground Cable to the E1200 PEM
Lug
Split-lock washer
Lug nuts
Figure 8-6. DC PEM with Connections in Place
-48 (-) cable
typically black
Ground studs
Ground cable
typically green
Return cable (+)
typically red
Installing DC Power Supplies
39
|